ČMC Mokrá Cement Plant
Alternative Fuel Feeding Lines
For Schenck Process, the project included a complete supply of alternative fuel technologies. The line begins at the units receiving fuel from trucks; this is followed by conveyance and storage systems. The fuel is conveyed from a store to separation and distribution systems. The flow of material in a distribution bunker is divided into two furnace lines. Both furnace lines of the cement plant are equipped with a gravimetric feeding system for alternative fuels for the main burner as well as for a calciner.
Main parameters | |
---|---|
Metered quantity: | 2 x 5 t/h – main burner 2 x 5 t/h – calciner 2 x 3 t/h – sludge |
Fuel type: | solid alternative fuel dried sewage sludge |
Year of realization: | 2008 |
Country: | Czech Republic |