Dalkia Poznan Power Plant
Alternative Fuel Feeding Line
Schenck Process was the general contractor of the project. Technology begins at the units receiving fuel from trucks; this is followed by screening of oversize particles. The material is then conveyed and distributed a high capacity storage system consisting of 4 silos for wood chips and wood pellets and storage hall of straw. From the storage system, the fuel is transported by a tube conveyor with length of almost 700 m to the boiler.
Main parameters | |
---|---|
Metered quantity: | 65 t/h |
Fuel type: | biomass |
Year of realization: | 2011 |
Country: | Poland |