Lafarge Tarmac Buxton Cement Plant
Alternative Fuel Dosing Lines
The project included supply of two independent processing lines for different types of fuel. The first is used for feeding solid alternative fuels (SAF), the second for wood chips. Schenck Process was the general contractor of the project in cooperation with the British branch.
The line begins at the units receiving fuel from trucks; this is followed by conveyance to a storehouse. From there, the fuel is conveyed to a sorting screen and then fed into the calciner combustion process.
Main parameters | |
---|---|
Metered quantity: | 2 x 8 t/h |
Fuel type: | solid alternative fuel wood chips |
Year of realization: | 2010 |
Country: | Great Britain |