Lebedinski GOK Ironworks
Tube Belt Conveyors
Schenck Process supplied two tube belt conveyors for Lebedinski GOK Ironworks that is situated at the largest Russia’s iron-ore mine in the city of Gubkin in the Belgorod region. The supply of the conveyors was realized through Primetals Technologies Austria who is the general contractor of LGOK 3 project , a new plant of the ironworks.
The supplied tube belt conveyors have been tailored to the needs of the customer and are equipped with a 1,300 mm wide belt and operated at a speed of 3.4 m/s. The conveyors have multi pulley drives, each conveyor having installed capacity of over 600 kW.
Main parameters | |
---|---|
Conveyed quantity: | 1,500 t/h |
Meterial: | iron oxide pellets |
Length: | 1,031 and 700 m |
Year of realization: | 2015 |
Country: | Russia |