ČMC Mokrá Cement Plant
Limestone and Dust Transport
Schenck Process supplied transport system for lump limestone and dust mixtures in Mokrá cement plant. The line comprises, among other equipment, three conventional belt conveyor s and a twin tube conveyor.
The tube conveyors are fitted with 800 mm wide belts running at 1,55 m/s. The central section of the conveyors is designed a common self-bearing bridge with a service walkway in-between the conveyors.
Main parameters | |
---|---|
Conveyed quantity: | 140 tph limestone 40 tph dust |
Meterial: | lump limestone filter dust mixtures |
Length: | 227 and 232 m |
Year of realization: | 2010 |
Country: | Czech Republic |