Ozarow Cement Plant
Alternative Fuel Feeding Line
Schenck Process was the general contractor of the project. Technology begins at the units receiving fuel from trucks; this is followed by screening of oversize particles and fuel sampling. The material is then conveyed and distributed to four high capacity storage silos. The fuel is extracted from the silos to a distribution bunker, which divides the flow of fuel into two independent runs. Each furnace unit is equipped with its own gravimetric system feeding the alternative fuel to the calciner combustion process.
Main parameters | |
---|---|
Metered quantity: | 2 x 25 t/h |
Fuel type: | solid alternative fuel |
Year of realization: | 2011 |
Country: | Poland |